Case Studies - October 2021

Case Studies - October 2021

Interested in COVID-19?

Get COVID-19 articles, news and videos right in your inbox! Sign up now.

COVID-19 + Get Alerts

Onsite system needed to accommodate winery/brewery in unique venue

Problem: Spyglass Winery in Sunbury, Pennsylvania, planning an expansion including a brewery and restaurant, needed a cost-efficient, long-term solution to treat high-strength wastewater and handle substantial flow fluctuations. It had to be easy to operate and consistently meet stringent treatment requirements for shallow subsurface infiltration.

Solution: Premier Tech Water and Environment designed a 2,000 gpd treatment system. The first stage includes a polyethylene primary treatment tank and a grease trap, each with 3,490 gallons capacity, followed by a 900-gallon equalization tank. These are combined with Premier Tech’s ready-to-use polyethylene Rewatec moving-bed bioreactors and clarifier, which reduces BOD and TSS to domestic strength. The process is completed by two Ecoflo biofilter units with 100% coco filtering medium. The integrated pump in the biofilters allows for low-pressure dosing of the at-grade bed where treated wastewater infiltrates.

Result: The system showed excellent resilience after sharply reduced flows during the COVID-19 pandemic. With the gradual resumption, the system continues to efficiently handle flow and contaminant-load fluctuations and to meet discharge criteria. 800-632-6356; www.pt-waterenvironment.com   



Discussion

Comments on this site are submitted by users and are not endorsed by nor do they reflect the views or opinions of COLE Publishing, Inc. Comments are moderated before being posted.